检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ayoub Tighazoui Christophe Sauvey Nathalie Sauer
机构地区:[1]Universitéde Lorraine,LGIPM,F-57000,Metz,France
出 处:《Journal of Systems Science and Systems Engineering》2021年第3期253-275,共23页系统科学与系统工程学报(英文版)
摘 要:Due to the fourth revolution experiencing,referred to as Industry 4.0,many production firms are devoted to integrating new technological tools to their manufacturing process.One of them,is rescheduling the tasks on the machines responding to disruptions.While,for static scheduling,the efficiency criteria measure the performance of scheduling systems,in dynamic environments,the stability criteria are also used to assess the impact of jobs deviation.In this paper,a new performance measure is investigated for a flowshop rescheduling problem.This one considers simultaneously the total weighted waiting time as the efficiency criterion,and the total weighted completion time deviation as the stability criterion.This fusion could be a very helpful and significant measure for real life industrial systems.Two disruption types are considered:jobs arrival and jobs cancellation.Thus,a Mixed Integer Linear Programming(MILP)model is developed,as well as an iterative predictive-reactive strategy for dealing with the online part.At last,two heuristic methods are proposed and discussed,in terms of solution quality and computing time.
关 键 词:RESCHEDULING FLOWSHOP predictive-reactive strategy weighted waiting time stability weighted completion time deviation
分 类 号:N94[自然科学总论—系统科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.220