检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶琦贵 YE Qi-gui
机构地区:[1]广西壮族自治区建材产品质量检验站,广西南宁530022
出 处:《砖瓦》2021年第6期21-23,共3页Brick-tile
摘 要:测量了砖瓦隧道窑预热带上、中、下层及两侧砖坯实际温度,描述了存在温度差异的砖坯状态,指出了温差问题对成品砖质量及生产成本的影响,分析了隧道窑预热带出现温差问题的原因,提出了设置预热带烟道和气幕扰流装置的技术方案,介绍了该方案的工程结构特点、工作原理、注意事项以及解决预热带砖坯温差问题的作用和意义。The actual temperature of the bricks on the upper,middle and lower layers and on both sides of the preheating zone of the brick tunnel kiln is measured,the state of the bricks with temperature differences was described,the influence of the temperature difference on the quality and production cost of the finished bricks is pointed out,and the preheating of the tunnel kiln is analyzed.The reason for the temperature difference in the belt is proposed.The technical plan for setting up the preheating flue and the air curtain spoiler device is proposed.The engineering structure characteristics,working principle,precautions of the plan are introduced,as well as the function and significance of solving the temperature difference problem of the preheating brick.
分 类 号:TU522.063[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.84.11