检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李江[1] LI Jiang(The 5th Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group,Jiujiang 332001,Jiangxi,China)
机构地区:[1]中铁大桥局集团第五工程有限公司,江西九江332001
出 处:《工程建设》2021年第5期54-59,共6页Engineering Construction
摘 要:立交桥在城市复杂施工条件下需要多次跨越既有高架桥。本文以长沙市湘府路万家丽立交工程为例,施工方案采用大型塔吊对钢箱梁进行整节段吊装,一次跨越既有高架桥。能有效解决现场施工位置狭小、吊装高度大、地铁交叉施工、交通压力大等难题,在复杂施工条件下将多层立交桥施工对城市交通干扰降到了最低。该施工技术可为国内同类型的钢箱梁跨线施工提供一定的借鉴与参考。Overpasses need to cross the existing viaduct many times under the complex urban construction conditions.Taking as an example the Wanjiali interchange project located at Xiangfu Road in Changsha City,a large tower crane is used to lift the whole section of steel box girder and cross the existing viaduct at one time,which effectively solves such difficulties as narrow construction location,high lifting height,subway crossing construction,high traffic pressure,etc.under the complex construction conditions,the construction of multi-layer interchange reduces the urban traffic interference to the minimum.The construction technology can provide references for the same type of domestic steel box girder construction in the future.
分 类 号:U448.28[建筑科学—桥梁与隧道工程] U445.4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222