高铁站内移频轨道电路区段分割原则探讨与分析  

Discussion and Analysis on the Division Principles of Frequency Shift Track Circuit in High-speed Railway Stations

在线阅读下载全文

作  者:廖文豪[1] Liao Wenhao(China Railway Siyuan Survey and Design Group CO.,LTD,Wuhan 460063)

机构地区:[1]中铁第四勘察设计院集团有限公司,湖北武汉430063

出  处:《长江信息通信》2021年第5期102-105,共4页Changjiang Information & Communications

摘  要:文章从轨道电路和车载设备可靠工作需求、平行进路作业和股道换端折返作业需求、相关标准规范其他要求等方面,对高铁站内ZPW-2000移频轨道电路的分割原则进行了探讨与总结,重点分析了股道分割点位置选择,并给出了推荐方案,可供工程设计参考。This article discussed and summarized about the division principles of ZPW-2000 frequency shift track circuit in highspeed railway stations from the following aspects:The reliable working requirements of track circuits and on-board equipments;The requirements of parallel approach and strand-way end-return operation;The requirements of the relevant standards.This article focused on the location selection of the division points about the arrival and departure tracks and recommended a plan which can be used as a reference for engineering design.

关 键 词:平行进路作业 换端折返作业 移频轨道电路 分割原则 股道分割点 

分 类 号:U284[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象