邻近既有铁路干线架梁施工技术及费用分析  被引量:3

Construction Technology and Cost Analysis of Beam Erection Adjacent to Existing Main Railway

在线阅读下载全文

作  者:李永德 LI Yong-de(China Railway Design Corporation,Tianjin 300308)

机构地区:[1]中国铁路设计集团有限公司工经院,天津300308

出  处:《铁路工程技术与经济》2021年第3期29-32,共4页Railway Engineering Technology and Economy

摘  要:临近铁路既有线施工常面临因既有线不限速、接触网已通电而引起的施工效率降低、施工费用较难确定的问题。本文针对太原枢纽西南环线架梁工程,详细阐述邻近既有线共墩架梁施工重难点、施工方案、施工步骤等内容,并通过参考铁路T梁架设定额,对该工况下架梁费用进行了分析,计算出该项目由于施工降效引起的费用增加幅度,以期为后续临近既有线施工工程的技术分析及费用计算提供参考。The railway construction,adjacent to existing railway,is often faced with the problems of the construction efficiency reduction and the cost difficult to determine,which are because the existing raiway lines are not limited in speed and the catenaries are energized.This paper takes the existing girders project of Taiyuan Hub,which is on the southwest ring road of Taiyuan hub and adjacent to Taizhongyin line as a case study to expound in detail about the construction difficulty,scheme and teps of common pier erecting beam on adjacent existing railway.By referring to the raiway T-beam erecting quota,the cost of erecting beam in this project is analyzed.The increase range the cost caused by the construction efficiency reduction of the project is calculated,which could provide reference for the technical analysis and cost calculation of the projects adjacent to th exsisting railway.

关 键 词:邻近既有铁路干线 架梁 施工技术 费用 分析 

分 类 号:F532.3[经济管理—产业经济] U24[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象