检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金鑫 JIN Xin(Shanghai Urban Drainage Co.,Ltd.,Shanghai 200235,China)
出 处:《中国市政工程》2021年第3期42-43,47,121,共4页China Municipal Engineering
摘 要:随着上海市中心城区防汛标准的提高,中小型市政泵站规模已无法满足防汛排水的最新要求。大型市政泵站的建设工程逐步增多,用地资源紧缺的矛盾与问题也日渐突出。通过剖析陇西泵站集约化平面布置案例,探索主体运行构筑物与附属配套设施的集约化布置,既满足规划用地控制要求、节约用地,又能保证泵房稳定运行。通过水力模型试验,论证不同平面布置方案对泵房运行的影响,确定最终陇西泵站的集约化布置方案,对今后中心城区建设大型市政泵站具有一定的借鉴意义。With the improvement of the flood control standards in Shanghai downtown,the scale of medium-small municipal pumping stations has been unable to meet the latest requirements for flood control&drainage.The construction of largescale municipal pumping stations has gradually increased,and the contradictions&problems of shortage of land resources have become increasingly prominent.By analyzing the case of the intensive layout of Longxi Pumping Station,explore the intensive layout of the main operating structures&auxiliary supporting facilities,which not only meets the control requirements of planned land use,saves land,but also ensures the stable operation of the pump house.In addition,through hydraulic model tests,the impact of different layout schemes on the operation of the pumping station is demonstrated,and the final intensive layout scheme of Longxi Pumping Station is determined,which has certain reference significance for the construction of large municipal pumping stations in the downtown in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.239