全套管钻机拔桩在立交桥拆除工程中的应用  被引量:3

Construction and Quality Control of Pile Pulling by Full Casing Drilling Machine in Interchange Bridge Demolition and Reconstruction Project

在线阅读下载全文

作  者:李伟[1] LI Wei(The 1st Engineering Co.,Ltd.of China Railway 18th Bureau Group,Zhuozhou,Hebei 072750,China)

机构地区:[1]中铁十八局集团第一工程有限公司,河北涿州072750

出  处:《广东水利电力职业技术学院学报》2021年第2期7-9,47,共4页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering

摘  要:立交桥梁拆除改造工程结构复杂、涉及内容较多。传统钻孔灌注桩施工技术具有一定的局限性,难以满足施工要求。对此,结合永和门立交桥工程实况,分析全套管钻机拔桩施工要点及质量控制措施,结果表明:全套管钻机拔桩施工采用钢套管护壁,具有成桩质量好、无泥浆污染、绿色环保等优势,立交桥梁拆除改造工程采用该施工技术及质量控制措施,可有效解决城市高填方、塌孔、缩颈、充盈系数高等问题,值得大范围推广应用。The interchange bridge demolition and reconstruction project is complex.The traditional bored pile construction technology cannot meet the construction requirements.Combined with the actual situation of Yonghemen interchange bridge project,this paper analyzes the key points and quality control measures of pile pulling with full casing drilling machine.The analysis shows that:with the steel casing wall protection,the pile pulling construction of the full casing drilling machine has the advantages of good pile quality,no mud pollution,and green environmental protection.Therefore,it is worthy of wide application,since it can effectively solve problems such as high fill,hole collapse,necking and high filling coefficient.

关 键 词:立交桥梁 改造工程 全套管钻机拔桩 质量控制 

分 类 号:U445.551[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象