检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱敏锐 Zhu Min-rui
机构地区:[1]韶关市第一建筑工程有限公司,广东韶关512026
出 处:《建筑技术开发》2021年第10期30-32,共3页Building Technology Development
摘 要:人字形钢管桁架屋面深受顾客喜爱。对大跨度弧线型、相贯焊接节点复杂及人字形钢管桁架支座特殊要求下,通过对人字形钢管桁架屋盖施工方案的研究,选择采用成熟的专用软件进行主展览馆的深化设计,在整体建模、数控切割、单榀整体胎架成型方面采取措施来保证工厂制作加工质量。现场采用大型起重机在建筑物外围进行吊装,塔式起重机辅助零散构件吊装方案,创新桁架支座连接方式实现设计意图,将蓝图转化成实体建筑物。The herringbone steel pipe truss roofs are popular with customers.Under special requirements for large-span arcs,complex intersecting welded connection nodes and herringbone steel pipe truss supports,through multi-scheme research on the construction of the herringbone steel pipe truss roof,mature special software was selected to deepen the design of the main exhibition hall,and measures were taken in terms of overall modeling,CNC cutting,and single-thrust overall tire frame forming to ensure the quality of factory production and processing.Large cranes are used on site to hoist around the building,tower cranes are used to assist hoisting of scattered components,design intent is achieved by innovative truss support connection method,and the blueprint is transformed into a physical building.
分 类 号:TU745[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117