检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨小军[1] Yang Xiao-jun
出 处:《建筑技术开发》2021年第10期108-109,共2页Building Technology Development
摘 要:一般施工过程中,主体建筑建成后,沉降基本完成后浇筑后浇带,这样可以有效避免沉降带来的损害。但实际施工过程中,后浇带施工会对工期造成不利影响,会和现场施工产生矛盾。结合实际案例,着重介绍地下室施工过程中后浇带提前封闭施工技术的应用。In the general construction process,after the main building is completed,the settlement is basically completed and the post-pouring zone is poured,which can effectively avoid the damage caused by settlement.However,in the actual construction process,the post-poured band construction will cause adverse impact on the construction period,and will have contradictions with the field construction.Combined with the actual case,the application of the construction technology of the advanced sealing of the postpouring zone during the course of the basement construction is emphatically introduced.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15