作 者:廖宏刚 朱淋淋 LIAO Hong-gang;ZHU Lin-lin(CCCC Dredging(Group)Co.,Ltd.,Shanghai 200082,China;CCCC Guangzhou Dredging Co.,Ltd.,Guangzhou,Guangdong 510290,China)
机构地区:[1]中交疏浚(集团)股份有限公司,上海200082 [2]中交广州航道局有限公司,广东广州510290
出 处:《中国港湾建设》2021年第6期68-71,共4页China Harbour Engineering
摘 要:以连云港港30万吨级航道二期工程为例,面对航道里程长、土质难挖、气象复杂等施工难点,提出了较为全面的控制措施,可使疏浚船舶发挥较高的挖泥效率,有效控制成本,安全顺利地完成工程任务,并总结了一套技术经验,可为后续工程或同类型项目提供借鉴和示范。Taking the second phase of the 300000 tons waterway project of Lianyungang Port as an example,aiming at the construction difficulties such as long channel length,difficult soil excavate,and complicated weather,we proposed more comprehensive control measures to enable dredging ships to exert higher dredging efficiency,effectively control costs,complete engineering tasks safely and smoothly,and summarized a set of technical experience,which can provide better reference and demonstration for follow-up projects or similar projects.
关 键 词:连云港港 30万吨级航道 疏浚工程 施工难点 控制措施
分 类 号:U616.2[交通运输工程—船舶及航道工程]