检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔庆蒙 张仟 Kong Qingmeng;Zhang Qian(Shandong Energy Feicheng Mining Group,Feicheng 271600,China;Shandong Ding’an Inspection Technology Corporation Ltd.,Feicheng 271600,China)
机构地区:[1]山东能源肥城矿业集团,山东肥城271600 [2]山东鼎安检测技术有限公司,山东肥城271600
出 处:《煤炭与化工》2021年第5期37-40,共4页Coal and Chemical Industry
摘 要:在超千米深井筒施工中,一般受厚冲积层淋水及高承压含水层淋水的威胁或影响。对肥矿集团井筒深达超千米的梁宝寺煤矿二水平井筒施工中,封堵高承压井筒淋水的注浆工艺、技术参数、浆液材料选择及井筒涌水变化规律进行总结研究,为超深立井开展井筒淋水灾害治理提供参考。In the construction of super-kilometer deep mine,it is generally threatened or influenced by the drenching water of thick alluvium and drenching water of high bearing aquifer.The grouting process,technical parameters,slurry material selection and the change law of wellbore water gushing were summarized and studied in the construction of the second level wellbore of Liangbaosi Mine,which had a wellbore depth of more than 1,000 meters,the technology provided reference for the management of wellbore water gushing disaster in super-deep vertical mines.
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.154.142