检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘国斌 侯国权 余超 崔松 LIU Guobin;HOU Guoquan;YU Chao;CUI Song(Guizhou Mining Company,Aluminum Corporation of China Limited,Guiyang 551413,China;BGRIMM Technology Group,Beijing 102628,China;National Centre for International Research on Green Metal Mining,Beijing 102628,China)
机构地区:[1]中国铝业贵州分公司矿业公司,贵州贵阳551413 [2]矿冶科技集团有限公司,北京102628 [3]国家金属矿绿色开采国际联合研究中心,北京102628
出 处:《中国矿业》2021年第S01期316-320,共5页China Mining Magazine
摘 要:在矿山开采过程中,不合理的回采顺序容易导致围岩变形、位移和破坏。为有效预防该类地质灾害发生,本文采用数值模拟仿真软件对猫场铝矿条带开采嗣后充填法采场回采顺序进行优化研究。通过分析采场整体和顶底板位移大小、顶板与矿柱应力分布以及整体塑性区体积大小,研究表明:方案Ⅰ(由南至北)的回采顺序最佳,该方案下采场整体位移5.396m、顶板位移为5.853m、地表位移为2.854m;顶板最小主应力为0.421MPa,矿柱最大主应力为25.4MPa;剪切破坏体积为0.628m~3,拉伸破坏体积0.248m~3。其中,位移与应力数值相较其他两种方案差值较小,但拉伸破坏体积差值较大,且该方案下位移、应力、塑性区体积均小于其他两种方案。因此,采用从南至北开采的回采顺序更有利于采场的稳定。In the mining process,unreasonable stoping sequence can easily lead to deformation,displacement and destruction of surrounding rock.In order to effectively prevent the occurrence of such geological disasters,this paper uses numerical simulation software to optimize the stope sequence of the subsequent filling method in Maochang aluminum mine strip mining.Through the analysis of the overall stope and roof and floor displacements,the stress distribution of the roof and pillars,and the overall plastic zone volume,the study shows that the stoping sequence in Option I(from south to north)is the best,and the overall stope displacement under this program is 5.396 m,The roof displacement is 5.853 m,the surface displacement is 2.854 m;the minimum principal stress of the roof is 0.421 MPa,the maximum principal stress of the pillar is 25.4 MPa;the shear failure volume is 0.628 m3,and the tensile failure volume is 0.248 m3.Among them,the displacement and stress values are smaller than the other two schemes,but the tensile failure volume difference is larger,and the displacement,stress,and plastic zone volume under this scheme are smaller than the other two schemes.Therefore,adopting the mining sequence from south to north is more conducive to the stability of the stope.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15