作 者:肖旺东 胡海宁 XIAO Wangdong;HU Haining(State Grid Changsha Power Supply Company,Changsha 410015,China)
机构地区:[1]国网湖南省电力有限公司长沙供电分公司,湖南长沙410015
出 处:《湖南电力》2021年第3期79-82,共4页Hunan Electric Power
摘 要:针对某变电站在正常运行时主变压器夹件接地电流过大的现象,通过带电检测、停电钻芯检查排查故障点,分析故障原因并对故障进行处理,对主变压器的安装、验收、检测工作提出建议。Aiming at the phenomenon that the ground current of the main transformer clamp is too large during the normal operation of a substation,the fault points are found through the live detection and the outage drilling inspection,the fault causes are analyzed and the fault is dealt with,and suggestions are put forward for the installation,acceptance and detection of the main transformer.