检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张海翔 李占东[1,2,4] 李阳 赵佳彬[3] 庞鸿[3] 姜洪福 ZHANG Haixiang;LI Zhandong;LI Yang;ZHAO Jiabin;PANG Hong;JIANG Hongfu(Heilongjiang Key Laboratory for Efficient Development of Gas Hydrate,Daqing,Heilongjiang 163318,China;College of Offshore Oil&Gas Engineering,Northeast Petroleum University,Daqing,Heilongjiang 163318,China;College of Petroleum Engineering Institute,Northeast Petroleum University,Daqing,Heilongjiang 163318,China;Sanya Offshore Oil&Gas Research Institute,Northeast Petroleum University,Sanya,Hainan 572025,China;Daqing Vocational College,Daqing,Heilongjiang 163255,China;Daqing Oilfield International Exploration&Deve-lopment Company,Daqing,Heilongjiang 163153,China)
机构地区:[1]黑龙江省天然气水合物高效开发重点实验室,黑龙江大庆163318 [2]东北石油大学海洋油气工程学院,黑龙江大庆163318 [3]东北石油大学石油工程学院,黑龙江大庆163318 [4]东北石油大学三亚海洋油气研究院,海南三亚57202 [5]大庆职业学院,黑龙江大庆163255 [6]中国石油大庆油田公司国际勘探开发公司,黑龙江大庆163153
出 处:《石油地球物理勘探》2021年第3期603-611,I0013,I0014,共11页Oil Geophysical Prospecting
基 金:国家科技重大专项“海上油田化学驱油技术”子课题“海上油田化学驱综合调整技术研究”(2016ZX05025-003-005);东北石油大学青年科学基金项目“远源砂质辫状河心滩增生体时空分异机理研究”(2018QNL-21)联合资助。
摘 要:目前渤海湾盆地多数油田已进入高含水期开发阶段,油藏模型、油水系统及面临的开发问题十分复杂,严重制约了油田可持续发展。为此,提出一套基于地震反演和沉积微相约束的建模方法,结合渤海湾盆地SZ36-1油田地质资料,以地震合成记录为桥梁,构建了基于相控"硬约束"和地震反演"软约束"的孔隙度模型。可信度分析认为该方法优势体现在:(1)基于双控的地质模型消除了硬约束的"痕迹",与岩相砂体发育趋势相吻合,且具有一定的井间预测功能,模型更符合地质认识;(2)模型具有较高精度的同时降低了地震约束建模的局限性。后验井平均符合率达92.51%,说明地震约束建模技术能够降低地质模型的不确定性,可信度较高。基于地震约束地质模型方法有助于进一步提高水驱采收率。At present,most offshore oilfields,especially in the Bohai Bay Basin,have entered into development stage with high water cut.This paper proposes a constrained modeling technology based on seismic inversion and sedimentary microfacies.Taking the SZ36-1 Oilfield in the Bohai Bay Basin as an example,aporosity model is built by using synthetic seismic records as a bridge,sedimentary microfacies as a"hard constraint"and seismic inversion as a"soft constraint".The method has technical advantages as follows:(1)The geological model based on double constraints is consistent with actual geological understanding.The model hasn’t the"trace"of the hard constraint.It is not only conformed to the development of sandstone lithofacies,but also can predict inter-well development.(2)The model has higher accuracy and the average coincidence rate of posterior wells is up to92.51%.In addition,it can reduce the uncertainty and the limitations of a geological model.The model based on double constraints is helpful to provide strong technical support for improving waterflooding oil recovery.
关 键 词:地震反演 地质建模 油藏数值模拟 剩余油 SZ36-1油田
分 类 号:P631[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.224