检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王香云[1] WANG Xiang-yun(Mechanical and Electrical Installation Engineering Department of ChinaCoal First Construction Co.,Ltd.,Handan 056000,China)
机构地区:[1]中煤第一建设有限公司机电安装工程处,邯郸056000
出 处:《价值工程》2021年第16期235-236,共2页Value Engineering
摘 要:矿井井筒建设和井筒装备安装施工是BIM技术应用的重要方面。BIM对于施工信息的实时性、全面性反馈实现了对工程项目从设计到施工全过程的动态化跟踪管理,使施工具有很大的前瞻性,做到了有备无患。本文首先分析了BIM的技术特点,对其在矿井井筒装备安装施工中的应用进行了探讨。Mine shaft construction and shaft equipment installation and construction are important aspects of BIM technology application.BIM's real-time and comprehensive feedback of construction information realizes the dynamic tracking management of the whole process from design to construction of the project,which makes the construction very forward-looking and prepared.This article first analyzes the technical characteristics of BIM,and discusses its application in the installation and construction of mine shaft equipment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.112.17