大纵坡长斜井同步衬砌混凝土质量控制  被引量:2

Quality Control of Synchronous Lining Concrete for Long Inclined Shaft with Large Longitudinal Slope

在线阅读下载全文

作  者:周选强 王胜龙 李焕乐 ZHOU Xuan-qiang;WANG Sheng-long;LI Huan-le(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2021年第6期43-47,共5页Yunnan Water Power

摘  要:在大纵坡、长斜井施工中混凝土输送方式的选择的显得尤为重要。云南滇中引水工程大理Ⅰ段2标施工支洞坡陡、水文地质复杂,工作空间狭小,混凝土施工难度大,为了解决混凝土施工质量,采取自行爬模行走、锁定、混凝土输送方式和施工缝面等处理措施,较好地解决了长斜井混凝土施工所面临的常规问题,并由此对长斜井混凝土施工积累了一定的经验。The selection of concrete conveying mode is particularly important in the construction of large longitudinal slope and long inclined shaft.With steep slope, complex hydrogeology, narrow working space and difficult concrete construction, the construction branch tunnel of Dali Section Ⅰ and Bid 2 of the water diversion project in Yunnan Province is constructed.In order to solve the quality of concrete construction, measures such as self-climbing formwork walking, locking, concrete conveying mode and construction joint surface are adopted, which preferably solves the routine problems faced by the long inclined shaft concrete construction and accumulates certain experience for the long inclined shaft concrete construction.

关 键 词:斜井 整体液压钢模台车 矮边墙接缝 二衬堵头模 浇筑 

分 类 号:TV554.14[水利工程—水利水电工程]

 