姚桥煤矿7013工作面冲击地压防治技术研究  被引量:2

Research on Rock Burst Prevention Technology of the 7013 Working Face in Yaoqiao Coal Mine

在线阅读下载全文

作  者:王登高 Wang Denggao(Yaoqiao Coal Mine of Datun Company of China Coal Group,Jiangsu Pei County 221611)

机构地区:[1]中煤集团大屯公司姚桥煤矿,江苏沛县221611

出  处:《山东煤炭科技》2021年第6期172-175,共4页Shandong Coal Science and Technology

摘  要:根据姚桥煤矿7013工作面临近断层群及不规则残留煤柱影响区的地质条件,对工作面进行分区分级开采。通过对工作面多因素耦合评价及危险区域划分,确定工作面回采时期的危险区域及危险等级。逐级采用不同布置密度的大直径钻孔卸压以及不同强度的顶板预裂爆破,对7013工作面冲击地压防治起到良好的卸压效果。According to the geological conditions of the 7013 working face near fault group and irregular residual coal pillar influence area in Yaoqiao Coal Mine,the working face is mined by zones and grades.Through the multi factor coupling evaluation and dangerous area division of the working face,the dangerous area and dangerous grade of the working face during the mining period are determined.Large diameter boreholes with different density and roof presplitting blasting with different strength are used step by step to relieve the pressure,which has a good effect on the prevention and control of rock burst in the 7013 working face.

关 键 词:冲击地压 多因素耦合 卸压措施 效果检验 

分 类 号:TD324.2[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象