检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何帅 HE Shuai(Xinjiang Water Conservancy and Electric Power Construction Corporation,Urumqi 830000,China)
机构地区:[1]新疆水利电力建设总公司,乌鲁木齐830000
出 处:《广西水利水电》2021年第3期16-20,共5页Guangxi Water Resources & Hydropower Engineering
摘 要:介绍了新疆某输水泵站工程的基本情况。根据泵站开挖出现的3个边坡裂隙发育情况,采用赤平投影法搜索出岩质边坡不稳定块体,考虑岩质边坡节理裂隙构造,采用楔形体稳定计算软件,计算了岩质边坡楔形体及上覆破碎岩体的稳定性,得出了楔形体及破碎岩体的稳定安全系数。通过计算分析,泵站周边坡在各个工况下整体稳定性较好,块体稳定及变形破坏问题不突出。根据计算结果,同时考虑工程安全储备,提出了岩质边坡的支护措施。An introduction was made on the general information of a water delivery pump station project in Xinjiang.According to the development of three slope fissures exposed after excavation,the unstable block of rock slope was searched by stereographic projection method.Taking into account the joint crack structure of rock slope,the stabili⁃ty coefficients of rock slope wedge and overlying fractured rock mass was calculated with wedge stability calculation software.The results of calculation and analysis demonstrate the surrounding slope of pump station is stable integral⁃ly under various operating conditions with stable block and without outstanding deformation problem.The support⁃ing measures for rock slope are proposed according to the calculation results while considering the engineering safe⁃ty reserve.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117