Energy recovery in China from solid wastes by the moving grate and circulating fluidized bed technologies  被引量:1

在线阅读下载全文

作  者:A.C.Bourtsalas Qunxing Huang Hanwei Zhang Nickolas J.Themelis 

机构地区:[1]Earth Engineering Centre,Columbia University,New York,USA [2]Zhejiang University,Hangzhou,China [3]SUS Environment,Shanghai,China

出  处:《Waste Disposal and Sustainable Energy》2020年第1期27-36,共10页废弃物处置与可持续能源(英文)

基  金:This study was supported by the Global WTERT Council (Columbia University) and was initiated based on the thesis by Olivier Morin(www.wtert.org,Publications),Earth Engineering Center,Columbia University.

摘  要:In recent years,the Chinese waste-to-energy(WTE)industry is growing at the rate of about thirty new plants each year.The municipal solid waste(MSW)fuel has a low heating value of 4-7 MJ/kg,in comparison to about 11 MJ/kg in U.S.and 8-11 MJ/kg in EU.Combustion of the low heating value fuel on a moving grate(MG),the dominant combustion technology worldwide,is difficult to control and measures have to be taken to remove some moisture prior to combustion.For this and other reasons,an alternative technology,the circulating fluid bed(CFB)has been implemented in China.This paper is a comparative study of the two technologies and was carried out by Columbia University and two senior engineers,representing the MG and CFB technologies of China.Data were derived from industrial operating plants and from the literature.The fuel to MG furnaces is as-received MSW,while the MSW to CFB reactors is pre-shredded using high-torque low-speed shredders.The availability of MG plants,over a 1-year period,is 90%+,while that of CFB facilities is 80%+.Also,the in-plant electricity consumption of MG plants is slightly lower than the consumption of CFB plants.The MG furnace is less compact,than that of a CFB combustion chamber,with a heat flux range from 0.5 to 0.6 MW/m^(2) of grate surface area,while that of CFB furnace was about 1.7 MW/m^(2) of furnace cross-section.The bottom ash in a MG process is typically wet-discharged and the recovery of metals is less efficient.A drawback of the CFB process is that the fly ash generated is 5-10%of the weight of MSW combusted,as compared to 1-3%for moving grate plants in China.

关 键 词:Municipal solid waste WASTE-TO-ENERGY WTE Circulating fluidized bed Moving grate Heat flux Plant availability 

分 类 号:X705[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象