汶川县水磨镇杨柏沟泥石流补充勘查及防治对策建议  

Supplementary Investigation of the Yangbaigou Debris Flow in Shuimo Town, Wenchuan and Suggestions on Its Control

在线阅读下载全文

作  者:赵仕权 殷鑫铭 ZHAO Shi-quan;YIN Xin-ming(Sichuan Huadi Construction Engineering Co.Ltd.,Chengdu,Sichuan610081)

机构地区:[1]四川省华地建设工程有限责任公司,成都610061

出  处:《四川地质学报》2021年第2期267-269,305,共4页Acta Geologica Sichuan

摘  要:受“8·20”特大暴雨影响,汶川县水磨镇杨柏沟爆发了泥石流灾害。泥石流的发生引发了沟域内物源条件和沟道条件发生了较大变化。本文根据“8·20”泥石流发生前的物源类型和泥石流中启动物源的类型以及“泥石流后剩余物源类型,分析了泥石流物源启动机理和模式,阐述了“8·20”前原防治方案并结合现有的沟道条件,在此基础上,提出设置拦挡坝、防护提、排导槽工程相结合的治理方案,以期为达到泥石流治理,类似泥石流灾害防治提供参考借鉴。The Yangbaigou Debris Flow in Shuimo Town,Wenchuan was caused by the heavy rainstorm on Aug.20,2011 which made the source condition and channel condition in the gully area change greatly.This paper deals with mechanism and mode of material source initiation of the debris flow based on material source type when the debris flow starts,the material source type before its occurrence and residual material source type after its occurrence on the basis of which a control scheme of the combination of retaining dam,protective lifting and drainage channel engineering is put forward.

关 键 词:泥石流灾害 物源 补充勘查 

分 类 号:P694[天文地球—地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象