检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李旭 刘玥 许栋 LI Xu;LIU Yue;XU Dong(The Third Geological Mineral Investigation Institute,Henan Geology and Mineral Exploration and Development Bureau,Zhengzhou 450003,China)
机构地区:[1]河南省地质矿产勘查开发局第三地质矿产调查院,河南郑州450003
出 处:《四川有色金属》2021年第2期19-21,26,共4页Sichuan Nonferrous Metals
摘 要:本文以上天梯产业集聚区压覆矿产资源为例,讨论面积性建设项目压覆矿产资源储量的估算方法。按照集聚区用地范围与矿体相邻处合理布置剖面,分析采矿最终边坡角及矿体形态,通过剖面法确定压覆界线,估算压覆矿产资源量。结果表明,该方法可行可靠,对同类面积性工程压覆露天开采的矿产资源储量估算具有一定参考价值。Taking the overlaid mineral resource buried on area of the Shangtianti industrial agglomeration as an example,this paper makes a study on the reserve estimation method of the overlaid mineral resource.The vertical section method is more intuitive and easy to understand to calculate the area of the linear project overlaid mine.According to the scope of land for concentrated area and the rational distribution of orebodies adjacent section,analysis of mining slope Angle and eventually orebody form,and the coverage area is delineated by the vertical section method to estimate the reserves of covered mineral resources.The result indicate that the estimation shows no deviation to the field survey data.The results show that this method is feasible and reliable,so as to offer some references about reserves estimation overlaid mineral resource by the similar linear project.
分 类 号:P624.7[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33