检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨锐 YANG Rui(Nanjing Water Facilities Management Center,Nanjing 210000,China)
出 处:《中国资源综合利用》2021年第6期196-198,共3页China Resources Comprehensive Utilization
摘 要:分散式临时净水站主要用于局部污水系统不完善和尚未完成雨污分流区域的污水处理,是污水系统建设过程中的临时过渡措施之一。本文以南京市为例,分析城区分散式临时净水站实施路径与建设模式,为各城市解决临时性水环境难题提供借鉴。Distributed temporary water purification stations are mainly used for sewage treatment in areas where the local sewage system is imperfect and the rain and sewage diversion has not been completed,it is one of the temporary transitional measures in the construction of sewage system.Taking Nanjing City as an example,this paper analyzes the implementation path and construction mode of urban decentralized temporary water purification stations,and provides a reference for cities to solve temporary water environment problems.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222