检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱兴旺[1] 王晓伟 孙娜科 ZHU Xingwang;WANG Xiaowei;SUN Nake
机构地区:[1]河北建设勘察研究院有限公司,河北石家庄050000
出 处:《中国矿山工程》2021年第3期27-29,共3页China Mine Engineering
摘 要:在金矿开采的前期阶段,供水水源严重制约着矿区的建设和开发,在研究前人资料基础上,优化某矿区水文地质勘察方案,改进水文地质钻探和成井工艺,开展抽水试验和放水试验联合试验,获得精确的水文地质参数,评价矿区地下水资源量,从而确定供水水源地开采方案,具有十分重要作用。At the initial stage of gold mining,water source and supply is a major constraint to mine development and establishment.Based on history data,the study optimized the hydrogeological exploration scheme,improved the hydrogeological drilling and shaft extension process.A combination of water extraction and discharge experiments was conducted,and accurate hydrogeological data were obtained to evaluate the water resource underground,and finally the water source site was determined.The study contributed to the water sourcing process.
分 类 号:TD783[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7