碾压混凝土大坝大升层施工温控技术  

Temperature Control Technology for Large Lift Construction of RCC Dam

在线阅读下载全文

作  者:左鹏杰 ZUO Pengjie(Henan No.1 Hydraulic Engineering Bureau,Zhengzhou,Henan,450000,China)

机构地区:[1]河南省水利第一工程局,河南郑州450000

出  处:《水电科技》2021年第3期7-9,共3页Hydroelectric Science & Tecnology

摘  要:在进行大坝施工过程中采用碾压混凝土方式可以提升工程的施工进度、效率及经济效益,因此得到了广泛的应用。从大坝混凝土施工角度来看,大升层体积相对较大,所以在进行施工过程中容易出现混凝土水化热现象,要想有效避免此种情况应对施工温度进行严格控制,从而避免混凝土出现裂缝,确保施工质量。In the process of dam construction,the use of roller compacted concrete can improve the construction progress,efficiency and economic benefits of the project,so it has been widely used.From the perspective of dam concrete construction,the volume of large rising layer is relatively large,so the phenomenon of concrete hydration heat is easy to appear in the construction process.In order to effectively avoid this situation,the construction temperature should be strictly controlled,so as to avoid concrete cracks and ensure the construction quality.

关 键 词:碾压混凝土 大坝大升层 施工温控技术 

分 类 号:TV544.921[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象