检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王娜 WANG Na(Zhejiang Tiandi Environmental Protection Technology Co.,Ltd.,Hangzhou 311100,China)
机构地区:[1]浙江天地环保科技股份有限公司,杭州311100
出 处:《价值工程》2021年第17期5-6,共2页Value Engineering
摘 要:PPP项目的投标报价有别于常规的工程施工项目,影响因素多,报价难度大。以国内某PPP项目为例,通过在报价得分和投资收益率计算中引入敏感性分析法,研究各投标因素对两者的影响程度,确定合理的投标报价策略,增加中标可能性的基础上保证了项目收益最大化。PPP project bid quotation is different from the conventional engineering construction project,the influencing factors are many,the quotation is difficult.Taking a domestic PPP project as an example,this paper introduces sensitivity analysis method into the calculation of quotation score and investment rate of return,studies the influence degree of various bidding factors on both,determines a reasonable bidding strategy,and ensures the maximization of project income on the basis of increasing the possibility of winning the bid.
关 键 词:PPP项目 社会资本方 财务测算 投标报价 敏感性分析
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173