检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Cuixia Miao Yunjie Xia Yuzhong Zhang Juan Zou
机构地区:[1]School of Mathematical Sciences,Qufu Normal University,Qufu,Shandong,273165,P.R.China [2]School of Physics and Engineering,Qufu Normal University,Qufu,Shandong,273165,P.R.China [3]School of Office,Qufu Normal University,Qufu,Shandong,273165,P.R.China [4]School of Management Sciences,Qufu Normal University,Rizhao,Shandong,276826,P.R.China
出 处:《Journal of the Operations Research Society of China》2013年第3期377-383,共7页中国运筹学会会刊(英文)
基 金:This work was supported by the National Natural Science Foundation of China(Nos.11201259,11071142,71101081);the Doctoral Fund of the Ministry of Education(Nos.20123705120001,20123705120003);the Natural Science Foundation of Shandong Province(Nos.ZR2011AL017,ZR2010AM034);Doctoral Research Fund(No.20110130)and Postdoctoral Researcher of Qufu Normal University;We thank the editor an。
摘 要:We consider bounded parallel-batch scheduling with proportional-linear deteriorating jobs and the objective to minimize the total completion time.We give some properties of optimal schedules for the problem and present for it a dynamic programming algorithm running in O(b^(2)m^(2)2^(m))time,where b is the size of a batch and m is the number of distinct deterioration rates.
关 键 词:Batch scheduling Deteriorating jobs Dynamic programming algorithm
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3