检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖乐 王刚 吴明鸥[2] XIAO Le;WANG Gang;WU Ming’ou(CPECC Southwest Company,Chengdu,Sichuan,610041,China;Research Institute of Natural Gas Technology,PetroChina Southwest Oil&Gasfield Company,Chengdu,Sichuan,610213,China)
机构地区:[1]中国石油工程建设有限公司西南分公司,四川成都610041 [2]中国石油西南油气田公司天然气研究院,四川成都610213
出 处:《天然气与石油》2021年第3期44-49,共6页Natural Gas and Oil
基 金:国家科技重大专项“页岩气地面工艺技术及高效设备研发”课题(2016ZX05037-005)。
摘 要:四川盆地页岩气开发地面工程多采用三甘醇(TEG)脱水工艺脱除原料天然气中的饱和水,以满足管输要求。现场运行数据表明,前期建设的页岩气脱水装置能耗相对较高。为降低页岩气脱水装置能耗,以处理规模300×10^(4)m^(3)/d的装置为例,借助ASPEN HYSYS V11.0模拟软件,选用Cubic-Plus-Association(CPA)物性包,并结合现场实际运行情况,对页岩气脱水装置的原料气进气温度、TEG循环量、重沸器再生温度、TEG贫液质量分数进行优化研究。研究结果表明:1)在进气温度为35℃、TEG循环量为2.5 m^(3)/h、重沸器再生温度为203℃、TEG贫液质量分数为99.2%的条件下,装置在产品干气满足管输要求的同时,节能效果明显,单位产品综合能耗降低了42.1%;2)经优化后,单套TEG脱水装置的工程投资降低了16.4%,可节省约230万元;3)与现有装置相比,单套装置节约用气27.4×10^(4)m^(3)/a,节约用电5.3×10^(4)kW·h/a,全年可节省运行费用约30.1万元。结论认为,研究成果可以为页岩气脱水装置的设计及优化提供参考。In the surface facilities engineering of shale gas development in Sichuan Basin,dehydration process by triethylene glycol(TEG)is most frequently used to remove the saturated water in raw natural gas to meet the pipeline transportation requirements.The field operation data shows that the energy consumption of the shale gas dehydration unit constructed in the early development stage is relatively high.In order to reduce the energy consumption of the shale gas dehydration unit,taking a 300×10^(4)m^(3)/d(3×10^(6)m^(3)/d)unit as an example,the feed gas inlet temperature,TEG circulation rate,regeneration temperature and lean TEG concentration of the shale gas dehydration unit are optimized.ASPEN HYSYS simulation software with the Cubic-Plus-Association(CPA)Property Package is used in this research,making use of the site operating conditions.The result shows that:1)under the conditions of feed gas inlet temperature of 35℃,TEG circulation rate of 2.5 m^(3)/h,regeneration temperature of 203℃,lean TEG concentration of 99.2%,treated product gas meets the requirements of pipeline transportation,and the energy conservation effect of this optimum operating conditions is obvious,as the comprehensive energy consumption for unit output of product is reduced by 42.1%;2)after optimization,the capital cost of a single set of TEG dehydration unit has been reduced by 16.4%,saving about 2.3 million RMB;3)compared with the current facilities,each single set of TEG dehydration unit can save 27.4×10^(4)m^(3)/a(274×10^(3)m^(3)/a)gas and 53×10^(3)kW·h/a(5.3×10^(4)kW·h/a)electricity,amounting to about 0.301 million RMB of annual operating cost saving.In conclusion,the research result can provide good reference for the design and process optimization of shale gas TEG dehydration unit.
分 类 号:TE96[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.17.22