检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高欣 GAO Xin(Shanghai Municipal Engineering Design Institute
机构地区:[1]上海市政工程设计研究总院<集团>有限公司,上海200092
出 处:《净水技术》2021年第S01期183-189,共7页Water Purification Technology
摘 要:针对上海某原水泵站需要在有限时间内需要通过改造,将输水能力由40万m^(3)/d提升至62万m^(3)/d的工程目标,研究现状输水泵房的主要瓶颈及优化方向,通过工艺、结构、造价等多专业的技术经济比较,提出以新建翻水泵房为核心的完善工程方案。方案具备实施工期短、功能保障度高的特点,同时,可永久解决原水库有效库容利用不足的问题,对同类原水泵站改造项目具备一定的借鉴参考意义。Raw water pump station upgrading plan was aiming at raising water transmission capacity from 4×10^(5)m^(3)/d to 6.2×10^(5)m^(3)/d through reconstruction in a limited time.Through studying the main bottleneck and optimization possibility of the current sta-tion,the project proposes a plan of constructing a new inner reservoir intake pump house.The recommended plan meets the advantage of short construction period and high operation safety and raises the storage capacity of raw water reservoir.The plan was considered representative for similar raw water pump station reconstruetion projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7