作 者:雷立志 潘琰枫 Lei Lizhi;Pan Yanfeng(Wuhan Hongtai Construction Engineering Quality Inspection Co.,Ltd.,Wuhan 430070,China)
机构地区:[1]武汉弘泰建筑工程质量检测有限公司,湖北武汉430070
出 处:《山西建筑》2021年第15期58-59,共2页Shanxi Architecture
摘 要:为确定某大跨度钢筋混凝土框架结构方案,从整体性能以及大跨度梁设计两个方面进行了方案比较。最终认为大跨度梁线刚度调整对整体性能影响不大,结构方案的确定应以大跨度梁的设计为主。在满足承载能力极限状态以及正常使用极限状态的情况下,应尽量找到一个平衡点,使成本以及施工质量都能兼顾。大跨度梁恒载内力占比较大,拆模时混凝土性能接近设计指标,建议延长拆模时间。In order to determine the scheme of a long-span reinforced concrete frame structure,the scheme comparison is made from two aspects of overall performance and long-span beam design.It is concluded that the adjustment of linear stiffness of long-span beam has little effect on the overall performance,and the determination of structural scheme should be based on the design of long-span beam.In the case of meeting the limit state of bearing capacity and the limit state of normal use,we should try to find a balance point,so that both the cost and the construction quality can be taken into account.The results show that the dead load internal force of long-span beam accounts for a large proportion,and the concrete performance is close to the design index when the formwork is removed.It is suggested to extend the formwork removal time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.41