箱梁预制场模板配置方案探讨  被引量:2

Discussion on formwork configuration scheme of box girder prefabrication yard

在线阅读下载全文

作  者:燕会平 Yan Huiping(China Railway First Group No.5 Engineering Co.,Lad.,Baoji 721000,China)

机构地区:[1]中铁一局集团第五工程有限公司,陕西宝鸡721000

出  处:《山西建筑》2021年第15期104-106,共3页Shanxi Architecture

摘  要:在竞争越来越激烈,利润空间越来越低的铁路建设市场上,保证质量的前提下,降低生产成本、追求利润成为各施工单位的主要工作重心,各制梁场在场地规划及布局时,都本着投资最小化,利润最大化为目标,合理地进行工装设备配备。通过对制梁场模板配置方式的探讨,得出1∶1的模型配置方式在施工成本、模型周转次数方面都具有较为显著的优点。In the railway construction market where the competition is more and more intense and the profit space is more and more narrow. Under the premise of ensuring quality,reducing production cost and pursuing profit have become the main work focus of each construction unit. In the site planning and layout of each beam making yard,the goal is to minimize investment and maximize profit,and the tooling equipment is reasonably equipped. In this paper,through the discussion of the configuration mode of the formwork in the beam making yard,it is concluded that the 1∶ 1 model configuration mode has its obvious advantages in the construction cost and model turnover times.

关 键 词:箱梁预制 模板配置 施工成本 

分 类 号:TU755.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象