检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:燕会平 Yan Huiping(China Railway First Group No.5 Engineering Co.,Lad.,Baoji 721000,China)
机构地区:[1]中铁一局集团第五工程有限公司,陕西宝鸡721000
出 处:《山西建筑》2021年第15期104-106,共3页Shanxi Architecture
摘 要:在竞争越来越激烈,利润空间越来越低的铁路建设市场上,保证质量的前提下,降低生产成本、追求利润成为各施工单位的主要工作重心,各制梁场在场地规划及布局时,都本着投资最小化,利润最大化为目标,合理地进行工装设备配备。通过对制梁场模板配置方式的探讨,得出1∶1的模型配置方式在施工成本、模型周转次数方面都具有较为显著的优点。In the railway construction market where the competition is more and more intense and the profit space is more and more narrow. Under the premise of ensuring quality,reducing production cost and pursuing profit have become the main work focus of each construction unit. In the site planning and layout of each beam making yard,the goal is to minimize investment and maximize profit,and the tooling equipment is reasonably equipped. In this paper,through the discussion of the configuration mode of the formwork in the beam making yard,it is concluded that the 1∶ 1 model configuration mode has its obvious advantages in the construction cost and model turnover times.
分 类 号:TU755.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.37