注浆加固技术在综采工作面过断层中的应用研究  被引量:5

Application of grouting reinforcement technology in fully mechanized mining face crossing fault

在线阅读下载全文

作  者:张占峰[1] ZHANG Zhanfeng(Shanxi Xiangning Coking Coal Group Fukangyuan Coal Industry Co.,Ltd.,Linfen Shanxi 041000,China)

机构地区:[1]山西乡宁焦煤集团富康源煤业有限公司,山西临汾041000

出  处:《山西化工》2021年第3期168-170,共3页Shanxi Chemical Industry

摘  要:煤岩体注浆加固是采用化学浆液来充填和固结围岩的断裂面,提高围岩整体性,保证围岩稳定。富康源矿为了解决过断层巷道顶板变形大的问题,本文以10503工作面为工程背景,利用数值模拟软件对注浆前后及不同注浆材料下的顶板下沉量进行分析,发现加固后顶板下沉量明显减小,且随着注浆孔距离的减小,顶板下沉量逐步减小,顶板稳定性好,为煤矿安全生产提供参考与借鉴。The grouting reinforcement of coal and rock mass is to use chemical slurry to fill and consolidate the fracture surface of surrounding rock,improve the integrity of surrounding rock and ensure the stability of surrounding rock.In order to solve the problem of large roof deformation in fault crossing roadway in fukangyuan mine,this paper takes 10503 working face as the engineering background,analyzes the roof subsidence before and after grouting and under different grouting materials by using numerical simulation software,and finds that the roof subsidence after reinforcement decreases obviously,and with the decrease of grouting hole distance,the roof subsidence gradually decreases,and the roof stability is good,which provides reference for coal mine safety production.

关 键 词:注浆加固 断层构造带 数值模拟 煤体强度 

分 类 号:TD823.18[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象