作 者:王瑞 WANG Rui(Fenxi Energy Co.,Ltd.,Linfen 041099,China)
机构地区:[1]山西临汾西山能源有限责任公司,山西临汾041099
出 处:《山西煤炭》2021年第2期79-83,共5页Shanxi Coal
基 金:国家自然科学基金资助项目(52074188)。
摘 要:生辉煤业20106工作面采煤方法为低位放顶煤机械化开采,而放顶煤工作面遗煤过多易发生自燃,造成拆架前出现温度异常区域及CO异常涌出。同时,顶板压力大、支架老化等问题使拆架进程缓慢,难以在规程要求的时限内完成封闭。为保证拆架期间的人机安全,生辉煤业调整了通风系统,两巷同时拆架,并采取注氮、注浆等防灭火措施,确保了在封闭时限内安全完成拆架工作。Lower position top-coal mechanized mining is used on 20106 working face in Shenghui Coal Industry.However,excessive residual coal in the caving face is prone to spontaneous combustion,causing abnormal temperature and CO emission before dismantling.Meanwhile,problems such as high pressure on roof and aging supports slow down the dismantling process and make it difficult to complete the sealing within the required time limit.In order to guarantee human and machine safety during the demolition,Shenghui Coal Industry adjusted the ventilation system.The two roadways were dismantled at the same time and fire control measures,such as nitrogen injection and grouting,were taken to ensure the completion of the dismantling work within the time limit.
分 类 号:TD75[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.9.72