检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈永明[1] 居勤章[1] 杨俊[2] CHEN Yongming;JU Qinzhang;YANG Jun(Baoshan Iron and Steel Co.,Ltd.)
机构地区:[1]宝山钢铁股份有限公司 [2]宝山钢铁股份有限公司炼铁厂,上海市200941
出 处:《炼铁》2021年第3期7-10,共4页Ironmaking
摘 要:在吸取以往经验的基础上,宝钢2号高炉炉体喷补在施工准备、降料线控制、喷涂施工和送风恢复等各个环节,准备工作充分、过程控制合理,实现了降料线安全受控、施工环节质量有保证和送风顺利恢复的预期目标。特别是为满足新的环保要求,降低炉顶煤气温度而增加的新水不可直接排放,需暂存后再处理,因此采取了一些优化改进措施。在降料线过程中,环缝新水用量从以往的12000t以上,大幅降低至3000t以下,顺利实现了新环保排放要求的目标。After sufficient preparation and adequate process control in operations of refractory gunning,stockline lowering and reblowing of Baosteel No.2,BF body based on the experience accumulated before,and safe stockline lowering,high quality refractory gunning and smooth re-blowing have been achieved as planned.Some optimization measures are taken to meet the new environmental protection requirements,that the fresh water which is used additionally for decreasing the top gas temperature cannot be discharged directly after usage,instead,it shall be collected and treated.The amount of fresh water used by the annular gap scrubbing system during stockline lowering operation is reduced greatly from over 12000 t:before to less than 30001,meeting the discharge requirements in the new environmental protection regulation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.72.80