检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Jian Xu Boyu Xie Siyang Liao Zhiyong Yuan Deping Ke Yuanzhang Sun Xiong Li Xiaotao Peng
机构地区:[1]the School of Electrical Engineering and Automations,Wuhan University,Wuhan 430072,China [2]the China Southern Power Grid Research Institute,China Southern Power Grid Company,Guangzhou 510663,China
出 处:《Journal of Modern Power Systems and Clean Energy》2021年第3期612-624,共13页现代电力系统与清洁能源学报(英文)
基 金:This work was supported in part by the National Key R&D Program of China(No.2017YFB0902900);the National Natural Science Foundation of China(No.51707136);the Natural Science Foundation of Hubei Province(No.2018CFA080).
摘 要:Due to the high penetration of renewable distributed generation(RDG),many issues have become conspicuous during the intentional island operation such as the power mismatch of load shedding during the transition process and the power imbalance during the restoration process.In this paper,a phase measurement unit(PMU)based online load shedding strategy and a conservation voltage reduction(CVR)based multi-period restoration strategy are proposed for the intentional island with RDG.The proposed load shedding strategy,which is driven by the blackout event,consists of the load shedding optimization and correction table.Before the occurrence of the large-scale blackout,the load shedding optimization is solved periodically to obtain the optimal load shedding plan,which meets the dynamic and steady constraints.When the blackout occurs,the correction table updated in real time based on the PMU data is used to modify the load shedding plan to eliminate the power mismatch caused by the fluctuation of RDG.After the system transits to the intentional island seamlessly,multi-period restoration plans are generated to optimize the restoration performance while maintaining power balance until the main grid is repaired.Besides,CVR technology is implemented to restore more loads by regulating load demand.The proposed load shedding optimization and restoration optimization are linearized to mixed-integer quadratic constraint programming(MIQCP)models.The effectiveness of the proposed strategies is verified with the modified IEEE 33-node system on the real-time digital simulation(RTDS)platform.
关 键 词:Intentional island renewable distributed generation(RDG) load shedding RESTORATION phase measurement unit(PMU) conservation voltage reduction(CVR)
分 类 号:TM61[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222