煤矿综采面切眼大断面巷道掘进技术研究  被引量:4

Study on Tunneling Technology of Large Cross-section Roadway in Fully Mechanized Coal Mining Face

在线阅读下载全文

作  者:李坤 Li Kun(Tongjialiang Mine of Jinneng Holding Coal Industry Group Co.,Ltd.,Shanxi,037003)

机构地区:[1]晋能控股煤业集团有限公司同家梁矿,山西037003

出  处:《当代化工研究》2021年第13期54-55,共2页Modern Chemical Research

摘  要:煤矿综采工作面切眼大断面巷道通常支护结构较复杂,不易掘进,为提高综采面切眼大断面巷道掘进效率,基于某掘进工作面工程概况,提出了一种新的综采工作面切眼大断面巷道掘进技术,该技术基于大断面一体式支护技术,并优化了综采作业流程,有效提升了切眼大断面掘进作业施工效率与施工的安全性,经具体应用,发现新支护方案不仅可使大断面掘进效率提升34.6%,而且可显著降低巷道顶板离层值,可为类似工况下的切眼大断面巷道掘进提供参考。The support structure of large-section cut roadway in fully mechanized coal mining face is usually complex and difficult to tunnel.In order to improve the tunneling efficiency of large-section cut roadway in fully mechanized coal mining face,a new tunneling technology of large-section cut roadway in fully mechanized coal mining face is put forward based on the engineering situation of a certain tunneling face.This technology is based on the large-section integrated support technology and optimizes the fully mechanized coal mining operation process,which effectively improves the construction efficiency and safety of large-section cut tunneling.It is found that the new support scheme can not only improve the efficiency of largesection tunneling by 34.6%,but also significantly reduce the roof separation value,which can provide reference for large-section tunneling under similar working conditions.

关 键 词:大断面巷道 一体式支护 掘进效率 顶板离层 

分 类 号:TD[矿业工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象