检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈晓奇[1] 闫凯敏 Chen Xiaoqi;Yan Kaimin(Coal Resources and Geology Bureau of Shanxi Coal Industry Department,Shanxi,030045;Qinhe Energy Group Co.,Ltd.,Shanxi,048200)
机构地区:[1]山西省煤炭工业厅煤炭资源地质局,山西030045 [2]沁和能源集团有限公司,山西048200
出 处:《当代化工研究》2021年第13期66-67,共2页Modern Chemical Research
摘 要:为了科学评价候村煤矿峰峰组上段相对隔水性能,在补充地质勘探HC51、HC62号钻孔中采用水压式双段止水栓塞对其进行了压水试验,通过计算各试段岩体透水率和渗透系数从而判断峰峰组上段相对隔水层的分界,证明压水试验不仅可以适用于水利水电、坝基、桥梁隧道等工程地质勘查中,同时,也可以在煤炭地质勘查中对其进行应用。In order to scientifically evaluate the relative water repellency performance of the upper part of peak-peak group in Houcun Coal Mine,a water pressure test was carried out by using hydraulic two-stage water-stopping plugs in drilling holes HC51 and HC62 in supplementary geological exploration.The boundary of the upper part of peak-peak group relative water-resisting layer was judged by calculating the permeability and permeability coefficient of rock mass in each test section,which proved that the water pressure test can be applied not only in engineering geological exploration of water conservancy and hydropower,dam foundation,bridge and tunnel,but also in coal geological exploration.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145