检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于其宜 王琦[2] 汤奕[1] YU Qiyi;WANG Qi;TANG Yi(School of Electrical Engineering,Southeast University,Nanjing 210096,China;School of NARI Electric and Automation,Nanjing Normal University,Nanjing 210046,China)
机构地区:[1]东南大学电气工程学院,江苏省南京市210096 [2]南京师范大学南瑞电气与自动化学院,江苏省南京市210046
出 处:《电力系统自动化》2021年第13期30-39,共10页Automation of Electric Power Systems
基 金:智能电网保护和运行控制国家重点实验室资助的开放课题(新能源高渗透率区域电网多无功源协调控制方法研究,SGNR0000KJJS1907537)的资助。
摘 要:风电场常因自身无功容量配置不足而导致并网点电压在某些工况下越限,参与并网点电压增援调控的周边无功补偿站,其增发/减发的无功功率会出现泄流效应。此效应既降低了对风电场电压的支撑力度,又可能引起其他节点电压出现新的越限。为此,针对并网点电压越限的预防控制问题,提出一种考虑泄流效应的风电场系统侧增援调控方法。首先,介绍了无功补偿增量的泄流效应并定义了泄流比;其次,讨论了待调控风电场周边变电站参与增援调控的基本条件,给出了筛选候选无功补偿站的方案;最后,设计了分配增援调控任务的启发式决策方法和考虑调控代价差异的线性规划模型优化决策方法。算例结果表明,所提出的2种增援调控站无功补偿决策方法均能将风电场并网点电压调整并稳定在设定的范围内。Due to the lack of reactive power capacity allocation in the wind farm, the grid-connected point voltage often exceeds the limit under certain operation conditions. The drainage effect of the increased/decreased reactive power of surrounding reactive power compensation substations participating in the reinforcing dispatch and control for the grid-connected point voltage will occur.This effect not only weakens the support for the wind farm voltage, but also may cause new voltage violations at other nodes. For the prevention and control of grid-connected point voltage violations, a system-side reinforcing dispatch and control method for the wind farm considering the drainage effect is proposed. Firstly, the drainage effect of the increment of the reactive power compensation is introduced and the drainage ratio is defined. Secondly, the basic conditions participating in reinforcing dispatch and control of substations to be regulated surrounding the wind farms are discussed and a scheme for selecting candidate substations is given. Finally, a heuristic decision-making method for allocating reinforcing dispatch and control tasks and an optimization decisionmaking method of linear programming model considering the difference of dispatch and control cost are designed. The case study results show that the two proposed decision-making methods for the reactive power compensation of the reinforcing dispatch and control substations can both adjust and stabilize the grid-connected point voltage of the wind farm within the set range.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.241.139