检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张丽花[1] 谢维科[1] 张浩[1] ZHANG Lihua;XIE Weike;ZHANG Hao(PowerChina Northwest Engineering Corporation Limited,Xi,an 710065,China)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065
出 处:《西北水电》2021年第3期49-52,57,共5页Northwest Hydropower
摘 要:石门沟3号水库为注入式水库,输水放空建筑物承担向水库下游供水及水库放空的任务。从地质、施工、投资、安全、运行等角度,对输水放空建筑物的形式和轴线进行了比选,最终选定了左岸有压隧洞形式。水库已建成供水,建筑物运行良好。Shimengou No.3 Reservoir is an inflow-type reservoir,and the water delivery and emptying structure undertakes the task of supplying water to the downstream of the reservoir and emptying the reservoir.From the perspectives of geology,construction,investment,safety and operation,etc.,the scheme and axis of the water conveyance and emptying structure are compared and selected,and finally the design scheme of pressure tunnel on the left bank is selected.The reservoir has been completed for water supply,and the structure is operating well.
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222