历史文物站房分阶段整体平移技术  被引量:3

Phased Overall Translation Technology for Historical Relic Railway Station Building

在线阅读下载全文

作  者:张小龙 庞小军[1] 熊云凡 ZHANG Xiaolong;PANG Xiaojun;XIONG Yunfan(Beijing Branch of China Railway Construction Engineering Group,Beijing 100070,China)

机构地区:[1]中铁建工集团有限公司北京分公司,北京100070

出  处:《建筑施工》2021年第6期1061-1063,共3页Building Construction

摘  要:为满足北京清河火车站站房工程建设需要,实现对清河历史站房文物的保护,在站房建设中引入建筑整体移位技术,进行文物站房的整体平移设计及施工。整体平衡技术节约了大量人力、材料、机械台班费用,避免了建筑物拆除和新建过程中的安全隐患,取得良好的社会和经济效益,可为类似工程施工提供借鉴。To meet the requirements of the construction of Qinghe Railway Station in Beijing and realize the protection of the historical relics of Qinghe Railway Station,the overall transition technology is introduced into the construction of the station to carry out the overall transition design and construction of the historical relic railway station.The overall translation technology saves a lot of manpower,materials and machinery costs,avoids the hidden dangers in the process of building demolition and new construction,and achieves good social and economic benefits.It can provide reference for similar engineering construction.

关 键 词:历史文物站房 分阶段 整体平移 结构加固 

分 类 号:TU746[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象