检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林健华 许其武 LIN Jian-hua;XU Qi-wu(Construction and Works Department ofNanshan District,Shenzhen,Shenzhen 518000,China;China Construction Science and Industry Corporation Ltd.,Shenzhen 518000,China)
机构地区:[1]深圳市南山区建筑工务署,广东深圳518000 [2]中建科工集团有限公司,广东深圳518000
出 处:《工程建设与设计》2021年第12期124-127,共4页Construction & Design for Engineering
摘 要:随着我国城市化进程的进一步发展,早年完工的各类高层建筑将逐步进入维修改造高峰,电动桥式脚手架由于其本身具备的诸多优势将替代常规脚手架和吊篮施工。论文通过实际工程案例,对电动桥式脚手架安装技术应用难点进行研究,并进行方案比选,为以后大量高耸建筑物立面改造提供借鉴。With the further development of China’s urbanization process,all kinds of high-rise buildings completed in the early years will gradually enter the peak of maintenance and renovation.Electric bridge scaffold will replace the conventional scaffold and hanging basket construction because of its own many advantages.Through the actual engineering cases,the paper studies the difficulties in the application of electric bridge scaffold installation technology,and compares the schemes,which provides reference for the elevation reconstruction of a large number of towering buildings in the future.
分 类 号:TU731.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117