摘  要:为规范环网柜基础部分概预算的编制,合理确定工程造价。以国网配电网典设HA-1方案环网柜基础施工图和另一种非典设环网柜基础施工图为例,在分别对其进行详细分解的基础上,确定每部分所采用的施工工艺,按照施工顺序模拟施工过程,并根据工作内容规范选用定额,以合理确定工程造价。In order to standardize the budgeting of the ring main unit(RMU)foundation,and determine the project cost reasonably,one construction drawing of the standard HA-1 scheme for state grid distribution network RUM foundation and the other of the nonstandard scheme are taken as examples.On the basis of detailed decomposition,the construction technology adopted by each part is determined.The construction process is simulated in accordance with the construction sequence,and the quota is selected according to the work content specification,so as to reasonably determine the project cost.

关 键 词:环网柜基础 概预算 定额 

分 类 号:TM643[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象