作 者:赵辉 郝利军 周晓辉[1] 徐庆华[1] ZHAO Hui;HAO Lijun;ZHOU Xiaohui;XU Qinghua(State Grid Handan Power Supply Company,Handan 056035,Hebei Province,China;Huilong Electric Power Design and Research Co.,Ltd.,Handan 056002,Hebei Province,China)
机构地区:[1]国网邯郸供电公司,河北邯郸056035 [2]慧龙电力设计研究有限公司,河北邯郸056002
出 处:《电力与能源》2021年第3期307-312,共6页Power & Energy
摘 要:为规范环网柜基础部分概预算的编制,合理确定工程造价。以国网配电网典设HA-1方案环网柜基础施工图和另一种非典设环网柜基础施工图为例,在分别对其进行详细分解的基础上,确定每部分所采用的施工工艺,按照施工顺序模拟施工过程,并根据工作内容规范选用定额,以合理确定工程造价。In order to standardize the budgeting of the ring main unit(RMU)foundation,and determine the project cost reasonably,one construction drawing of the standard HA-1 scheme for state grid distribution network RUM foundation and the other of the nonstandard scheme are taken as examples.On the basis of detailed decomposition,the construction technology adopted by each part is determined.The construction process is simulated in accordance with the construction sequence,and the quota is selected according to the work content specification,so as to reasonably determine the project cost.
分 类 号:TM643[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.170.29