检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟砥宁[1] 王均星[2] ZHONG Dining;WANG Junxing(Guangdong No.2 Hydropower Engineering Co.,Ltd, Guangzhou 511340,China;School of Water Resources and Hydropower Engineering, Wuhan University,Wuhan 430072,China)
机构地区:[1]广东水电二局股份有限公司,广东广州511340 [2]武汉大学水利水电学院,湖北武汉430072
出 处:《广东水利水电》2021年第7期58-63,共6页Guangdong Water Resources and Hydropower
摘 要:在修山水电站枢纽工程原设计方案的基础上,通过整体水工模型和泄水闸断面模型试验研究,对枢纽的导墙及上下游导航墙提出优化调整,并对下游消能防冲设计提出试验推荐方案。实验研究成果可供类似工程参考。Through the whole hydraulic model and sluice section model test of the project,the rationality and feasibility of the layout and structural design of the project were summarized and demonstrated.It provided a basis for optimization design and achieves better economic benefit.It was worth considering in the future engineering design and can be used as a reference for similar projects.
分 类 号:TV131.61[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28