检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘虹 罗小钢 LIU Hong;LUO Xiao-gang(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Liyuan Power Generation Branch,Lijiang 674122,China)
机构地区:[1]云南华电金沙江中游水电开发有限公司梨园发电分公司,云南丽江674122
出 处:《云南水力发电》2021年第7期243-245,共3页Yunnan Water Power
摘 要:顶盖排水系统是水轮发电机组必要的辅助系统之一,不论机组在发电态亦或是停机态,顶盖积水主要由导叶中轴套漏水和顶盖与大轴间漏水等原因引起,顶盖排水泵作为顶盖排水系统的核心,其作用是排走渗漏积水,防止积水过多引发水淹水导轴承,导致机组非计划停运。以梨园水电站机组顶盖排水泵运行时间长为例,深刻剖析其原因并对系统进行了优化改造,大大提高了顶盖排水系统的可靠性。Roof drainage system is one of the necessary auxiliary systems for hydro-generator units.Whether the unit is in power or shutdown state,water accumulation on roof is mainly caused by water leakage between the bushing in the guide vane and between roof and large shaft.Roof drainage pump is the core of roof drainage system.Its function is to drain seepage,prevent excessive seepage from causing flooding of the guide bearing and lead to unplanned outage of the unit.Taking Liyuan Hydropower Station as an example,this paper profoundly analyzed the reasons for the long operation time of roof drainage pump and carried out optimization and modification to the system,which greatly improved the reliability of roof drainage system.
分 类 号:TV734.21[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40