检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王斌[1] WANG Bin(Jianghan Oilfield Company,Sinopec,Qianjiang,Hubei,433121,China)
机构地区:[1]中国石化江汉油田分公司,湖北潜江433124
出 处:《江汉石油职工大学学报》2021年第3期34-36,共3页Journal of Jianghan Petroleum University of Staff and Workers
摘 要:涪陵页岩气田焦石坝老区逐渐进入稳产开发调整阶段,相较于开发初期,平台部署井数增加、水平井水平段间距减小、单井水平段加长,龙马溪组页岩气地层经过压裂、试气、采气等环节,地层压力系统发生改变,受地层限制井身结构优化和机械钻速提高遇到瓶颈。为了降低钻井周期和工程成本,减少钻井复杂故障时效,从钻井设计角度出发,分析存在的问题与提出建议,为下一步开发调整阶段钻井提速提效提供技术支撑。Jiaoshiba old area of Fuling shale gas field gradually enters into the stage of stable development adjustment,and compared with the early development,the number of pad wells increases,the spacing between horizontal sections decreases,and the length of a horizontal section for a single well increases.The formation pressure was subject to changes following the fracturing jobs,gas testing,gas production and others,and the optimization of wellbore structure and increase of ROP are restricted by stratigraphic limit.In order to reduce the drilling cycle,engineering cost,and drilling outage time,from the perspective of drilling design,the challenges were analyzed and the solutions were put forward,so as to provide technical support for improving the ROP and drilling efficiency in the next stage of development adjustment.
关 键 词:涪陵页岩气田 焦石坝区块 钻井工程设计 开发调整井
分 类 号:TE22[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198