基于工艺比选的廊坊市铁路北污水处理厂总图设计  被引量:2

General Layout Design of Langfang Railway North Sewage Treatment Plant Based on Process Comparison and Selection

在线阅读下载全文

作  者:唐冰 李玲 孙璐扬 Tang Bing;Li Ling;Sun Luyang(China Urban Construction Research Institute Co.,Ltd.,Beijing 100120,China)

机构地区:[1]中国城市建设研究院有限公司,北京100120

出  处:《市政技术》2021年第7期160-163,共4页Journal of Municipal Technology

摘  要:廊坊市铁路北污水处理厂建设迫在眉睫,为了保障厂区出水达标并结合厂区现状用地情况,根据污水处理规模、设计进出水水质、投资成本、操作管理难度以及提升水质空间等多方面因素,对A2/O和MBR 2种工艺进行比选,在此基础上进行了厂区总图设计。The construction of Langfang railway north sewage treatment plant is imminent.In order to ensure the effluent standard of the plan,combined with the current land situation,the A^(2)0 process and the MBR process are compared and selected in this article according to the treatment scale,the design of water quality,the investment cost,the difficulty of operation and management,space for improving water quality and other factors.And then the general layout of the plant is carried out.This design is certain guide to the layout of the plant with small area and similar main process of water quality,sewage treatment and reclaimed water reuse.

关 键 词:污水处理厂 厂区总图设计 A2/O工艺 MBR工艺 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象