检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Sufang WANG Yiyi CHEN
机构地区:[1]Shanghai University of Electric Power,Shanghai 201300,China [2]College of Civil Engineering,Tongji University,Shanghai 200092,China
出 处:《Frontiers of Structural and Civil Engineering》2009年第4期345-351,共7页结构与土木工程前沿(英文版)
摘 要:In beam-to-column joint with bolted end-plate connection,the structural details of column flange reinforced by backing plate and column web panel reinforced by supplementary plate are analyzed.The joint is divided into some basic components,and the initial stiffness of each component is obtained.Especially,the initial stiffness of reinforced components is drawn by theoretical model and finite element analysis.The initial stiffness of reinforced joint can be obtained by assembling the initial stiffness of each component.The design moment resistance of column flange reinforced by backing plate is deduced based on yield line method,and the design moment resistances of other components are deduced based on present codes.The design moment resistance of the reinforced joint is then determined by the minimum of the design moment resistances of all components.By comparison with the results of finite element calculation,it is verified that the method to calculate the initial stiffness of reinforced joint is accurate enough to be used to estimate the rigid behavior of the joint and to make parametric study.
关 键 词:steel structure end-plate connection backing plate supplementary web plate initial stiffness moment resistance
分 类 号:TB3[一般工业技术—材料科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.166.121