检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Xudong FU Fan LIU Guangqian WANG Wenjie XU Jianxin ZHANG
机构地区:[1]State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing 100084,China [2]Bureau of Hydrology,Ministry of Water Resources,Beijing 100084,China
出 处:《Frontiers of Structural and Civil Engineering》2011年第1期1-10,共10页结构与土木工程前沿(英文版)
基 金:supported by the State Key Laboratory of Hydroscience and Engineering(Grant No.2008-TC-1);China Ministry of Science and Technology through the 973 project(Grant No.2008CB425803).
摘 要:The massive 8.0-magnitude Wenchuan Earthquake triggered huge landslides,avalanches,and debris flows that blocked rivers and created 34 important quake lakes,including the Tangjiashan Quake Lake on the Tongkou River.More than half of these lakes were identified to be of moderate or high hazard levels,so activities needed to be undertaken for hazard mitigation of potential flooding.This paper presents the mitigation processes of quake lake hazards,which involve various techniques such as rapid hazard analysis,scenario-based mitigation planning,and real-time forecasting of outburst flooding for implementation actions.The shortage of hydrologic and geological data and the nature of emergency situations raise substantial challenges in the hazard mitigation of quake lakes.This paper suggests a potential approach in dealing with quake lake hazards,which integrates the automatic monitoring network,hydrologic models,and hydrodynamic models with a comprehensive indicator for hazard levels.The necessity of improving the integrated methodology is highlighted.
关 键 词:quake lake hazard mitigation dam failure EMERGENCY Tangjiashan
分 类 号:P31[天文地球—固体地球物理学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222