检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡昊[1] 郑雄明 许昌[1] HU Hao;ZHENG Xiongming;XU Chang(Hubei Qingjiang Hydroelectric Development Co., Ltd., Yichang 443000, China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2021年第7期35-38,共4页Hydropower and New Energy
摘 要:结合隔河岩500 kV GIS设备一起内部放电故障及其过程,从诊断试验和解体检查两方面分析故障原因,对设备进行在线监测试验,结合超声波、超高频局部放电检测技术及SF6气体成分检测大龄设备绝缘的老化趋势。经对设备针对性检修,采取应对措施,预防此类故障,保障了机组安全运行。A grounding fault of the 500 kV gas insulated switchgear(GIS)device in Geheyan Hydropower Station is analyzed.Possible causes of the fault are determined with diagnosis tests and disassembly inspection.It is also suggested that online monitoring tests of the equipment should be carried out and combined with the ultrasonic,UHF partial discharge detection technology and SF6 gas composition detection to determine the ageing trend of the insulation of older equipment.Then,targeted maintenance of the equipment and prevention measures could be taken to ensure the safe operation of the unit.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117