正利煤业二采区井下移动瓦斯抽采系统设计研究  被引量:1

Design and Research on Underground Mobile Gas Drainage System in No.2 Mining Area of Zhengli Coal Industry

在线阅读下载全文

作  者:谢一德 Xie Yide(Shanxi Coking Coal Group Lanxian Zhengli Coal Industry Co.,Ltd.,Shanxi Lanxian 033599)

机构地区:[1]山西焦煤集团岚县正利煤业有限公司,山西岚县033599

出  处:《山东煤炭科技》2021年第7期122-125,共4页Shandong Coal Science and Technology

摘  要:正利煤业延伸至二采区,由于抽采路线增大,原先一采区抽采系统陈旧,无法满足二采区抽采需求。为有效解决抽采系统抽采能力不足的问题,设计一套井下移动抽采系统,并进行了抽采能力校核。抽采效果考察分析可知,新的抽采系统保证预抽瓦斯量为41%,回采过程中同时对高位钻孔和插管进行抽采,回风巷、上隅角瓦斯浓度未超标。Due to the increase of the extraction route,the original extraction system of the first mining area is old,which can not meet the demand of the second mining area.In order to solve the problem of insufficient extraction capacity of extraction system,a set of underground mobile extraction system was designed and verified.According to the investigation and analysis of the drainage effect,the new drainage system ensures that the pre drainage gas amount is 41%.In the process of mining,the high-level drilling and intubation are used for drainage at the same time,and the gas concentration in the air return roadway and upper corner does not exceed the standard.

关 键 词:瓦斯抽采 抽采系统 移动泵站 抽采能力校核 

分 类 号:TD712.6[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象