检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何宁 He Ning(Zisheng Coal Industry Co.,Ltd.,Huozhou Coal Electricity Group Co.,Ltd.,Shanxi Coking Coal Group Co.,Ltd.,Huozhou,Shanxi 031400)
机构地区:[1]山西焦煤霍州煤电紫晟煤业有限责任公司安全科,山西霍州031400
出 处:《江西煤炭科技》2021年第3期38-39,42,共3页Jiangxi Coal Science & Technology
摘 要:紫晟煤业2-1012巷采用数值模拟方法分别对三种支护方案下巷道围岩塑性区及变形量进行分析,得到最优支护设计参数。模拟结果表明,巷道围岩稳定性受锚杆锚固力影响较大,增大锚固力可以控制塑性区的发育,达到控制巷道围岩稳定性的目的。工作面回采期间,对巷道顶板及两帮位移量监测结果表明,巷道顶板最大移近量为92.4 mm,两帮最大移近量为70.2 mm,巷道围岩变形量基本位于合理范围内,现有支护能够保证巷道围岩稳定性。To obtain the optimal supporting design parameters,the author analyzes the plastic zones and the deformation of roadway surrounding rock under three kinds of supporting schemes in 2-1012 roadway by numerical simulation,whose simulation results show that due to the influence of bolt anchorage force on surrounding rock stability,the anchoring force can be increased to control the development of plastic zone and realize the control of roadway surrounding rock stability;and the deformation of roadway surrounding rock is basically within a reasonable range with the maximum convergence of 92.4 mm in roadway roof and 70.2 mm in two sides under the existing support.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195